Friday, January 25, 2013 11:00am EST
From Hall A Wiki
Previous meeting: Friday, January 11, 2013 11:00am EST
Agenda
- Seamus - remoll progress update
- Rupesh - GEM/Tracking
- Mindy - Target Length Studies [1]
- Konrad - Lambda production and decay
- Peiqing - detector update First look of integrating detectors in the full simulation environment
Minutes
- Seamus - working on repository. Really missing the generators before it comes useful to start looking at. Will add in ability to specify field currents, field position offset. Publicly available fields needs to be scaled to nominal values.
- Mindy - Meet about ep's it Feb 1.
- Konrad (via Seamus) - Making progress on the Lambda generators. Continuing to pull together numbers for cross sections and has a plan for generating events.
- Peiqing - looked at slides, will proceed with proper event weighting to look at crosstalk between different event types in the rings
Next meeting will be Feb 1
Return to Teleconferences
Return to MOLLER at 11 GeV E09-005