Tuesday, Aug 6, 2013 11:00am EDT

From Hall A Wiki
Revision as of 11:46, 6 August 2013 by Silwal (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Back to Main Page >> Meetings >> Teleconferences

Logistic information

   Phone number:  1-866-740-1260
   Access code:   1978431#

Agenda

  • Review the cost of tracking assembly for 3 GEM system (KK)
    • GEMs and associated electronics
    • GEM surface area (covering 25% feasible?)
    • support structure
  • Nilanga's questions:
    • Given ~75 um position resolution, can we get the required accuracy for MOLLER from 3 GEMs in air, one after the vacuum window, one before the quartz, and one in middle? http://ace.phys.virginia.edu/MollerSpectrometer/276
    • Given 3 z-locations, what should be the dimensions of the GEMs (to capture Moller, ep & enough of the radiative tail)?
    • What are the required resolutions in r and phi?

Minutes

  • Participants: Seamus, Juliette, Rupesh, KK, Nilanga