Sunday, November 9: OWL Shift

From Hall A Wiki
Revision as of 11:22, 8 November 2014 by Gaskelld (Talk | contribs)

Jump to: navigation, search
  • General considerations
    • We do not yet have an RC phone. Dave Gaskell is the current Run Coordinator. Please contact me directly via the JLab paging utility: [1]
    • Follow the generic Instructions for shift takers
    • In general, technical staff should not be contacted by the shift crew - please call the RC first.
    • If the run plan calls for some significant period of beam at 10 uA or greater please call Mahmoud Ahmad, who would like to perform a parasitic beam diagnostic test (no impact to us). His contact information will be written on the white board in the Counting House.
  • Instructions for this shift
    • Continue LHRS-Calorimeter coincdence running on carbon. Beam current TBD.
    • Kinematics, DVCS Kin1: Ebeam = 7.3 GeV, PLHRS=2.71 GeV Theta_HRS=22.83 Theta_calo=12.35
    • Make sure to use the DVCS configuration for all runs.