Friday, November 21: Owl Shift
From Hall A Wiki
Go back to Daily Run Plan Daily Run Plans
- General considerations
- Vincent Sulkosky is the current Run Coordinator. Please contact me directly via RC phone 757-876-1787
- Follow the generic Instructions for shift takers
- Shift leaders: Please make sure to fill out the beam time accounting form and write a "Shift Summary" log entry at the end of your shift regardless if there is beam or not.
- In general, technical staff should not be contacted by the shift crew - please call the RC first.
- Instructions for this shift
- The target operator is required to supervise the cryo-target.
- Kinematics, DVCS Kin1: Ebeam = 7.3 GeV, PLHRS=2.71 GeV, Theta_HRS=22.83, Theta_calo=12.35
- Note the controls for the left dipole are not stable, so do not change the momentum settings.
- Make sure to use the DVCS CODA configuration for all runs (even when taking single arm HRS data).
- No beam on this shift due to MCC not being able to send CW beam to Hall A, while Hall D is running. The situation will be evaluated Friday during the day.
- Until then, Hall A will not get beam. We will keep a two people shift crew till tomorrow.