Go back to Daily Run Plan Daily Run Plans
- General considerations
- Kalyan Allada is the current Run Coordinator. Please contact me directly via RC phone 757-876-1787
- Follow the generic Instructions for shift takers
- Shift leaders: Please make sure to fill out the beam time accounting form and write a "Shift Summary" log entry at the end of your shift regardless if there is beam or not.
- In general, Hall technical staff should not be contacted by the shift crew - please call the RC first.
- Instructions for this shift
- The target operator is required to supervise the cryo-target.
- Kinematics, DVCS Kin1: Ebeam = 7.3 GeV, PLHRS=2.71 GeV, Theta_HRS=22.83, Theta_calo=12.35
- Make sure to use the DVCS CODA configuration for all runs (even when taking single arm HRS data).
- MCC will work tonight to setup beam for Hall A
- If only tune beam is available then:
- Take a run with raster ON and T8 pulser (with ps8=100), check raster pattern and halog it
- Take a run with raster ON and HRS trigger, check raster pattern and halog it
- Instructions for CW beam
- When stable CW beam has been achieved for Hall A, execute the following steps of the "Beamline" run plan here.
- Note that we will NOT be going through the Compton chicane.
- Initial BPM/Raster checks/Beam centering
- BPM Calibrations (Bullseye Scan) [1-2 hours]
- Superharp Scan with Raster off/on
- If time remains, start spectrometer checkout and begin looking for HRS-calorimeter coincidences. For this part of the plan - contact Carlos and Paul (contact info on the white board).
- The calorimeter HV will need to be turned on and put in the correct position - this will be done by Carlos or his assigned substitute.
- Preliminary BCM Calibrations up to 10-20 μA, or what MCC can deliver if lower than this.
- When stable CW beam has been achieved for Hall A, execute the following steps of the "Beamline" run plan here.