Sunday, December 7: OWL Shift
From Hall A Wiki
Revision as of 13:04, 7 December 2014 by Hornt (Talk | contribs) (New page: Go back to Daily Run Plan Daily Run Plans * General considerations ** Tanja Horn is the current Run Coordinator. Please contact directly via RC phone 757-876-1787 ** Follow the generic...)
Go back to Daily Run Plan Daily Run Plans
- General considerations
- Tanja Horn is the current Run Coordinator. Please contact directly via RC phone 757-876-1787
- Follow the generic Instructions for shift takers
- Shift leaders: Please make sure to fill out the beam time accounting form and write a "Shift Summary" log entry at the end of your shift regardless if there is beam or not.
- In general, Hall technical staff should not be contacted by the shift crew - please call the RC first.
- The target operator is required to supervise the cryo-target.
- Kinematics, DVCS Kin1: Ebeam = 7.3 GeV, PLHRS=2.71 GeV, Theta_HRS=22.83, Theta_calo=12.35
- Make sure to use the DVCS CODA configuration for all runs (even when taking single arm HRS data).
- Instructions for this shift
- Ion chamber calibration for LH2 target
- Change configuration for elastic calibration, LH2 target, 5 uA, no raster
- Call RC for polarity change