Sunday, December 7: OWL Shift

From Hall A Wiki
Revision as of 13:04, 7 December 2014 by Hornt (Talk | contribs) (New page: Go back to Daily Run Plan Daily Run Plans * General considerations ** Tanja Horn is the current Run Coordinator. Please contact directly via RC phone 757-876-1787 ** Follow the generic...)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Go back to Daily Run Plan Daily Run Plans

  • General considerations
    • Tanja Horn is the current Run Coordinator. Please contact directly via RC phone 757-876-1787
    • Follow the generic Instructions for shift takers
    • Shift leaders: Please make sure to fill out the beam time accounting form and write a "Shift Summary" log entry at the end of your shift regardless if there is beam or not.
    • In general, Hall technical staff should not be contacted by the shift crew - please call the RC first.
    • The target operator is required to supervise the cryo-target.
    • Kinematics, DVCS Kin1: Ebeam = 7.3 GeV, PLHRS=2.71 GeV, Theta_HRS=22.83, Theta_calo=12.35
    • Make sure to use the DVCS CODA configuration for all runs (even when taking single arm HRS data).
  • Instructions for this shift
    • Ion chamber calibration for LH2 target
    • Change configuration for elastic calibration, LH2 target, 5 uA, no raster
    • Call RC for polarity change