Tuesday, March 23: OWL Shift
From Hall A Wiki
Revision as of 23:08, 23 March 2015 by Parkkj (Talk | contribs) (New page: Go back to Daily Run Plan Daily Run Plans * General considerations ** Brad Sawatzky is the current Run Coordinator. Please contact directly via RC phone 757-876-1787 ** Follow the gene...)
Go back to Daily Run Plan Daily Run Plans
- General considerations
- Brad Sawatzky is the current Run Coordinator. Please contact directly via RC phone 757-876-1787
- Follow the generic Instructions for shift takers
- Shift leaders: Please make sure to fill out the beam time accounting form and write a "Shift Summary" log entry at the end of your shift regardless if there is beam or not.
- In general, Hall technical staff should not be contacted by the shift crew - please call the RC first.
- The target operator is required to supervise the cryo-target.
- Make sure to use the DVCS CODA configuration for all runs (even when taking single arm HRS data).
- Instructions for this shift
1) When beam first arrives to the Hall
- Ask MCC to run the Harps: 1C18A/B and 1C04A/B - halog the results
2) Confirm the beam position using the carbon hole target. 3) Run the right arm optic scan described here:
Here is the run plan for the R-HRS Q1 tune. This can be done before moving to LH2 target for DVCS running.
1. Move target to Optics 2. Set P0= 1.0 GeV/c, Q1 current = 192 A 3. Set R-HRS prescale ps1=1, others=0 (should be already set, but check) 4. Assuming 20uA beam current, take 5 min (or ~100k events) run for each of these Q1 currents: Q1 current: 192 A 202 A 223 A 234 A 5. Move to LH2 target to continue DVCS runs 6. Change R-HRS P0 = 1.896 GeV (need to cycle Q2/Q3) 7. Set Q1 current to 403.8 A 8. When D1 is ready start R-HRS runs. 9. halog all the run numbers with Q1 current