Tuesday, April 14, 2015 11:30am EST
From Hall A Wiki
Last meeting: Thursday, March 26, 2015 10:00am EST
Collimator working group meeting
Agenda
- Engineering
- KK Intro. slides
- Jason's summary
- Supports
- Water cooling
- Remote adjustments
- Physics
- power deposited sims
- sensitivity sims
Minutes
Attending: Juliette, Jason, Ernie, Tyler, Seamus, KK, Jim
- Account extended at MIT, waiting for funds from JLAB
- KK's intro
- 4 - downstream of target beampipe needs to be designed
- definitely metal seals throughout
- top could maybe be rubber
- 5 - Collimator concept
- collimator 3 catches lowest angle
- power divided between 1 and 3
- 5 does not exist, but other numbers are accurate
- last green is new #5
- 6 - estimated power still old numbers
- new numbers are pretty close
- beam pipe to shield photons from edge of 1 and 2
- 4 - downstream of target beampipe needs to be designed
Return to Teleconferences
Return to MOLLER at 11 GeV E09-005