Tuesday, April 14, 2015 11:30am EST

From Hall A Wiki
Revision as of 11:48, 14 April 2015 by Crowder (Talk | contribs) (Minutes)

Jump to: navigation, search

Last meeting: Thursday, March 26, 2015 10:00am EST



Collimator working group meeting

Agenda



  • Engineering
    • KK Intro. slides
    • Jason's summary
    • Supports
    • Water cooling
    • Remote adjustments
  • Physics
    • power deposited sims
    • sensitivity sims



Minutes

Attending: Juliette, Jason, Ernie, Tyler, Seamus, KK, Jim

  • Account extended at MIT, waiting for funds from JLAB
  • KK's intro
    • 4 - downstream of target beampipe needs to be designed
      • definitely metal seals throughout
      • top could maybe be rubber
    • 5 - Collimator concept
      • collimator 3 catches lowest angle
      • power divided between 1 and 3
      • 5 does not exist, but other numbers are accurate
      • last green is new #5
    • 6 - estimated power still old numbers
      • new numbers are pretty close
      • beam pipe to shield photons from edge of 1 and 2




Return to Teleconferences
Return to MOLLER at 11 GeV E09-005