Collimator working group meeting
Agenda
- Engineering
- KK Intro. slides
- Jason's summary
- Supports
- Water cooling
- Remote adjustments
- Physics
- power deposited sims
- sensitivity sims
Minutes
Attending: Juliette, Jason, Ernie, Tyler, Seamus, KK, Jim
- Account extended at MIT, waiting for funds from JLAB
- KK's intro
- 4 - downstream of target beampipe needs to be designed
- definitely metal seals throughout
- top could maybe be rubber
- 5 - Collimator concept
- collimator 3 catches lowest angle
- power divided between 1 and 3
- 5 does not exist, but other numbers are accurate
- last green is new 5
- 6 - estimated power still old numbers
- new numbers are pretty close
- beampipe shown as designed in slide 14
- 7 - E158 Concept (won't work exactly)
- micrometer controls to change orientation of collimator (x, y)
- we have to support along radial direction in shadow of collimators
- 1 and 3 have to be precisely placed
- 1, 2 and 3, 4 could be single units but collimator 3 has slipped further upstream
- 8-12 2-bounce system
- Need to block line of sight to detectors
- slide 4 - encircle beampipe close to target
- beam pipe to shield photons from edge of 1 and 2
- 13 - shows how to block line of sight
- 14 - realistic geometry
- 4 - downstream of target beampipe needs to be designed