Preparations-DOE2015-Nov-Review

From Hall A Wiki
Revision as of 13:05, 25 September 2015 by Jones (Talk | contribs)

Jump to: navigation, search

Response to DOE 2014 review report

  1. Final report from DOE Nov 2014 SBS review.
  2. DOE Nov 2014 recommendations with responses. Initial response to the recommendations and comments.

DOE 2015 review

  • Draft agenda.
  • Dry run talks:
    • SBS Science Update and Overview (Wojtsekhowski)
    • SBS Project: Cost, Schedule and Management (Jones)
    • Dependency overview (Keppel)
    • WBS 1 – SBS Basic: Magnet and Infrastructure (Wines)
    • WBS 2 – Neutron Form Factor: CDet (Khandaker)
    • WBS 3 – Proton Form Factor: GEM (Liyanage)
    • DAQ VME and Fastbus (Moffitt)
    • Background MC – all experiments (Riordan)
    • Breakout: Dependencies (Room B207)
      • Polarized 3He target (Cates)
      • HCal ( Franklin)
      • ECal (Riordan)
      • GRINCH (Averett)