Thursday, February 4, 2016 4PM ET
Previous meeting: Tuesday, January 19, 2015 10AM ET
Here is the task list we discussed for the coming year:
1. Collimator design and shielding (Rakitha)
Collimator Designing: Designing the beam intercepting collimator (Primary collimator) collaborating with engineering
Shielding: Shielding beam intercepting collimator to minimize the radiation dose, especially neutron radiation.
2. Pion rate (W&M, Rakitha, Ciprian)
Study the pion rate as well as maintain/develop a reliable pion generator.
3. Target length optimization (???)
Play with target length (try 1.25m) to check the correlations of backgrounds, maybe the systematic error can be better than 1.5m design.
4. optical simulation (Yuxiang, anybody else?)
Can be separated in to two parts, 1)Gas scintillation simulation with different light guide design, 2) real quartz simulation with different light guide design and different "cut" on quartz
5. Detector prototype (Yuxiang)
6. Background study and systematic error study (Yuxiang)
Maintain the analysis framework of systematic error estimation. Play with the quartz segmentation to study the correlations between different backgrounds.
Return to Teleconferences
Return to MOLLER at 11 GeV E09-005