Run Plan (DVCS3)

From Hall A Wiki
Revision as of 11:48, 13 February 2016 by Jroche (Talk | contribs)

Jump to: navigation, search

For the 12 GeV DVCS experiment, go to [DVCS3 wiki ].


For this Winter 2016 we are only scheduled for 10 week. Therefore we estimate that we will only be able to take the data points highlighted in green.

Run plan, Beam Energies include Injector Energy


Winter 2016 optic plans

Winter 2016 calorimeter calibration (elastic)

[Target boiling]



old stuff below



Fall 2014 run plan

Previous version without injector energy:

DVCS-kin-E12-06-114 02-10-16.jpg