Beam Line
From Hall A Wiki
Revision as of 10:20, 30 September 2008 by Vasulk (Talk | contribs) (→HARP and HARP scan procedures)
Contents
- 1 E06-010 Instrumentation Requirement List: Jian-Ping Chen's memo to Kees De Jager, 08/07/08
- 2 ARC energy measurement
- 3 Compton Polarimeter
- 4 HARP and HARP scan procedures
- 5 Beam raster
- 6 Beam charge monitors (BCM) and calibration procedure
- 7 Beam position monitors (BPM) and calibration procedure
- 8 Moller polarimeter and results of measurements
- 9 Scattering chamber upstream and downstream beam pipe size and window thickness
- 10 HAPPEX Luminosity (Lumi) monitors
- 11 Beam dump
E06-010 Instrumentation Requirement List: Jian-Ping Chen's memo to Kees De Jager, 08/07/08
ARC energy measurement
Compton Polarimeter
HARP and HARP scan procedures
Please follow the directions at the Harp Scan Page [Harp Scan page]