Tuesday, Mar. 08: DAY Shift
From Hall A Wiki
Go back to Daily Run Plan Daily Run Plans
Previously...
- Production data (Kin48_3)
Specific mission
- Elastic measurement during DAY
- 6:30 am: Beam Off, Call MCC to put Hall A in Controlled Access Starting Ramping HRS-L magnets to 0 - 7:30 am: Tech in Hall, Change HRS-L Polarity, Move Angle to 40.0 deg, Set Momentum = 2.5106 GeV/c, Q1 = 1900 Amp - 8:30 am: Elastic Angle Calibration: DVCS Trigger s0 only in HRS trigger, Elastics with Calo in current Kin_048_3 setting [here], 15 microAmp - 9:30 am Escorted Access Move Calo to 6 m, 14.0 deg - 10:00 Elastic Energy Calibration data 20 microAmp - 10:30 Escorted Access, Move Calo to 13.1 deg - 11:00 Elastic Energy Calibration data - 11:30 Escorted Access: Move Calo to 12.25 deg - 12:00 Elastic Energy Calibration data - 12:30 Move Calo to Kin_48_2 setting: 15.184 deg, D=2.0 m, 10 micro Amp - 13:00 Angle Calibration Data (This puts the central elastic 7.1 GeV electrons 2.0 blocks from the physical edge of the calorimeter.) - 14:00 Controlled Access? Ramp down HRS-L Polarity, Angle change HRS-L to 20.244 deg to p = -3.996 GeV/c, Q1 = 1900 Amp - 15:00 Production DVCS at KIN_48_2[here]
- Back to Production run, Kin48_2
- After Alex's work, Compton laser will be turned OFF !
- Polarized beam at 15 uA on LH2 15 cm! (out of chicane ? )
- DVCS is running kin_48_2 [here]
- LHRS is partially detuned: [here]
- LHRS=3.996GeV, Q1/Q2/Q3=1916.640(readout:1900)/1600/1600 (Q1 regul.OFF)
- PreScaleR : PS1=PS2=PS3=1, && PS8=200
- PreScaleL : PS9 =1, + DVCS config.
- beam locks: no position lock, energy lock in Arc 2: [here]
- DVCS daq configuration is [this one], we are measuring about 2% DT at 15uA.
BPM/Spot++ Check
- After beam lost for considerable time (like beam study, pass change,...)
- Ask MCC to run 5uA wth carbon hole target and make sure you can see the hole through Spot++
Please check more info on the white board in the Counting House ~!!