Tuesday, Mar. 08: SWING Shift
From Hall A Wiki
Revision as of 19:51, 7 March 2016 by Parkkj (Talk | contribs) (New page: Go back to Daily Run Plan Daily Run Plans <b>Previously...</b> * Elastic data * Production data (Kin48_2) <b>Specific mission</b> *** <b>Production run, Kin48_2 </b> ** After Al...)
Go back to Daily Run Plan Daily Run Plans
Previously...
- Elastic data
- Production data (Kin48_2)
Specific mission
- Production run, Kin48_2
- After Alex's work, Compton laser will be turned OFF !
- Polarized beam at 15 uA on LH2 15 cm! (out of chicane ? )
- DVCS is running kin_48_2 [here]
- LHRS is partially detuned: [here]
- LHRS=3.996GeV, Q1/Q2/Q3=1916.640(readout:1900)/1600/1600 (Q1 regul.OFF)
- PreScaleR : PS1=PS2=PS3=1, && PS8=200
- PreScaleL : PS9 =1, + DVCS config.
- beam locks: no position lock, energy lock in Arc 2: [here]
- DVCS daq configuration is [this one], we are measuring about 2% DT at 15uA.
BPM/Spot++ Check
- After beam lost for considerable time (like beam study, pass change,...)
- Ask MCC to run 5uA wth carbon hole target and make sure you can see the hole through Spot++
Please check more info on the white board in the Counting House ~!!