Left HRS Quad Tuning Plan
From Hall A Wiki
Revision as of 11:50, 14 October 2016 by Vasulk (Talk | contribs) (New page: * <b>Left-HRS Kinematics: 1st Pass (E<SUB>beam</SUB> = 2.2 GeV)</b> <br> <table border="1" style="width:80%"> <tr> <td>E<SUB>beam</SUB> [GeV]</td> <td>P<sub>0</sub> [GeV/c]</t...)
- Left-HRS Kinematics: 1st Pass (Ebeam = 2.2 GeV)
Ebeam [GeV] | P0 [GeV/c] | θe [deg] | Q2 [GeV2] | W [GeV] | Rate [Hz] at 20 μA | minutes for 2M events at 20 μA |
2.217 | 1.0 | 17.5 | 0.20 | 1.72 | 9800 (3260 Hz with ps = 3) | 10 |
We want to take runs with the following Q1 currents:
- 0%: 204.5 A
- -10%: 184.05 A
- -5%: 194.275 A
- -2%: 200.41 A
- +2%: 208.59 A
- +5%: 214.725 A
- +10%: 224.95 A