Left HRS Quad Tuning Plan

From Hall A Wiki
Revision as of 11:50, 14 October 2016 by Vasulk (Talk | contribs) (New page: * <b>Left-HRS Kinematics: 1st Pass (E<SUB>beam</SUB> = 2.2 GeV)</b> <br> <table border="1" style="width:80%"> <tr> <td>E<SUB>beam</SUB> [GeV]</td> <td>P<sub>0</sub> [GeV/c]</t...)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search
  • Left-HRS Kinematics: 1st Pass (Ebeam = 2.2 GeV)
Ebeam [GeV] P0 [GeV/c] θe [deg] Q2 [GeV2] W [GeV] Rate [Hz] at 20 μA minutes for 2M events at 20 μA
2.217 1.0 17.5 0.20 1.72 9800 (3260 Hz with ps = 3) 10

We want to take runs with the following Q1 currents:

  1. 0%: 204.5 A
  2. -10%: 184.05 A
  3. -5%: 194.275 A
  4. -2%: 200.41 A
  5. +2%: 208.59 A
  6. +5%: 214.725 A
  7. +10%: 224.95 A