ps1,2,3=1, ps8=200; beam off for much of run 22146
22155 - 22157
15cm LH2
2 x 2 mm2
8.841
2.101
48.75
12.65
ps1,2,3=1, ps8=200; 5 uA
22158 - 22160
15cm LH2
2 x 2 mm2
8.841
2.101
48.75
12.65
ps1,2,3=1, ps8=200
22161
15cm LH2
2 x 2 mm2
8.841
2.101
48.75
12.65
ps1,2,3=1, ps8=200; very short run
22162-22167
15cm LH2
2 x 2 mm2
8.841
2.101
48.75
12.65
ps1,2,3=1, ps8=200; these are all short runs (about 30-40 mins)
22168-22172
15cm LH2
2 x 2 mm2
8.841
2.101
48.75
12.65
ps1,2,3=1, ps8=200
22174-22181
15cm LH2
2 x 2 mm2
8.841
2.101
48.75
12.65
ps1,2,3=1, ps8=200
Still 4 pass here, but spectrometer moved for DVCS calibration and then moved back before the following runs.
No survey was done at this position, but a point run 22297 was taken on multi-foil carbon target at this position.
Raster size in MCC unit also changed (check image of carbon hole target and raster current in start- and end-of-run for details)
Run number
Target
Raster
Ebeam [GeV]
P0 [GeV/c]
θe [deg]
Q2 [GeV2]
Comment
22263 - 22264, 22266 - 22293
15cm LH2
2 x 2 mm2
8.841
2.101
48.89
12.65
ps1,2,3=1, ps8=200
22300 - 22301, 22303 - 22314
15cm LH2
2 x 2 mm2
8.841
2.101
48.89
12.65
ps1,2,3=1, ps8=200
5th Pass (Ebeam = 11.0 GeV)
Run number
Target
Raster
Ebeam [GeV]
P0 [GeV/c]
θe [deg]
Q2 [GeV2]
Comment
22196-22197,22202-22207, 22209-22212
15cm LH2
2 x 2 mm2
11.021
2.204
48.75
16.54
ps1,2,3=1, ps8=200
22225-22229, 22235-22236, 22238, 22240-22241
15cm LH2
2 x 2 mm2
11.021
2.204
48.75
16.54
ps1,2,3=1, ps8=200
Spectrometer moved for DVCS calibration after 4-pass run 22314. No survey was done at this position, but a point run 22328 was taken on multi-foil carbon target at this position.
ps1,2,3=1, ps8=200; Raster failed and repaired between run 22361 and 22366, look at this link and here to see what happened
22407 - 22409
15cm LH2
2 x 2 mm2
11.021
2.204
48.75
16.54
ps1,2,3=1, ps8=200; trippy beam
22410 - 22413, 22415
15cm LH2
2 x 2 mm2
11.021
2.204
48.75
16.54
ps1,2,3=1, ps8=200
22419 - 22426, 22428 - 22429
15cm LH2
2 x 2 mm2
11.021
2.204
48.75
16.54
ps1,2,3=1, ps8=200; raster failed and fixed before run 22419; raster size was set to 2(H)x2(W) in MCC units (it was 2(H)X3(W) in MCC units before the raster failure); run 22427 was during Compton setup
Step R2: Delta Scan with Proton Elastic (without sieve slit)
Run number
Target
Sieve
Raster
Ebeam [GeV]
P0 [GeV/c]
θe [deg]
Comment
22006
15cm LH2
No
2 x 2 mm2
2.30
1.304
48.75
Delta scan ΔP=-4%; ps1,2=1
22007
15cm LH2
No
2 x 2 mm2
2.30
1.279
48.75
Delta scan ΔP=-2%; ps1,2=1
22008
15cm LH2
No
2 x 2 mm2
2.30
1.254
48.75
Delta scan ΔP=0%; ps1,2=1
22011
15cm LH2
No
2 x 2 mm2
2.30
1.229
48.75
Delta scan ΔP=+2%; statistics a bit low; ps1,2=1
22013
15cm LH2
No
2 x 2 mm2
2.30
1.203
48.75
Delta scan ΔP=+4%; ps1,2=1; dipole not stable in run 22012
Step R3: Dummy Target Runs
Run number
Target
Sieve
Raster
Ebeam [GeV]
P0 [GeV/c]
θe [deg]
Comment
22009 - 22010
15cm dummy
No
2 x 2 mm2
2.30
1.254
48.75
ps1,2=1
Target boiling study
The run plan and spectrometer settings for target current scan can be found here.
Carbon Target Current Scan
Run number
Beam current [μA]
Raster
Comment
13430, 22464
60
2.5x3
LHRS: ps1=10; RHRS: ps1=6
13431, 22465
45
2.5x3
LHRS: ps1=4; RHRS: ps1=2
13433, 22466
25
2.5x3
LHRS: ps1=2; RHRS: ps1=1
13434, 22467
10
2.5x3
LHRS: ps1=1; RHRS: ps1=1
15-cm Aluminum dummy
Run number
Beam current [μA]
Raster
Comment
13435, 22468
40
2.5x3
LHRS: ps1=4; RHRS: ps1=2
LH2 current scan
Run number
Beam current [μA]
Raster
Comment
13436, 22469
10
2.5x3
LHRS: ps1=5; RHRS: ps1=3
13437, 22470
20
2.5x3
LHRS: ps1=6; RHRS: ps1=3
13438, 22471
30
2.5x3
LHRS: ps1=6; RHRS: ps1=4
13439, 22472
40
2.5x3
LHRS: ps1=7; RHRS: ps1=4
13440, 22473
50
2.5x3
LHRS: ps1=8; RHRS: ps1=5
13441, 22474
60
2.5x3
LHRS: ps1=9; RHRS: ps1=6
Beam energy measurement
This is a collection of halog entries on the beam energy measurement. It might not be complete, and some of them might not be useful. I just keep them here for future reference.