RICH commisionning plan

From Hall A Wiki
Revision as of 23:12, 2 November 2008 by Camsonne (Talk | contribs) (New page: Basic check-out of detector with parasit ==1 pass beam== ==2 pass beam== ==Pending issue==)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Basic check-out of detector with parasit

1 pass beam

2 pass beam

Pending issue