Target Operator Check List

From Hall A Wiki
Revision as of 16:42, 3 November 2008 by Jinhuang (Talk | contribs) (After Call for a Bean on Request to MCC)

Jump to: navigation, search

Target Operator Should Finish This check list for every shift.

Every Half Hour

  • Pumping Laser Absorption Spectrum
  • No Error in Spin Flip Control Status Window
  • 5 Heart Beats are on for Spin Flip Main Window

Every 2 Hour

  • Check polarization drift
  • Check Cell Temperature
  • Check Oven Temperature

Every Shift

  • Generate a Report from Spin Flip Main Window
  • Screen Shot Pumping Laser Absorption Spectrum
  • Screen Shot Laser Control Window
  • Screen Shot Cell Temperature Reading

After Call for Beam to MCC

  • Check Raster Size
  • Check Beam Current
  • Check Trigger Rate