  1. Status reports

Minutes

Attendance: Juliette, KK, Cameron, Ernie, Jim, Rakitha

  1. Prototype coil
    1. water test plumbed incorrectly
      1. run in series instead of parallel
    2. shipping on winding device
    3. B-stage - stuck together turn-to-turn when moved to vacuum chamber
      1. rectangle with hole
      2. radius on corners
      3. fiberglass tape half-lapped
      4. B-stage is pre-impregnated tape vs. just tape
      5. w/ latter back-fill with epoxy
      6. former does not make a monolithic structure
      7. ground wrap after w/ fiberglass tape
      8. B-stage can be made with rad-hard epoxy
      9. would still need to make with vacuum impregnation to remove voids
    4. JLAB job, admin by JLAB
    5. testing water flow at MIT-Bates
  2. Other priorities
    1. Radiation dose
      1. using number from spec sheet
      2. not sure if it is just neutrons or E&M
      3. maximum dose limits are very high, but we're running for 30k hours
      4. needs to still look at e- and gamma
    2. Sensitivities
    3. segmented coil
  3. Magnet Advisory Group Meeting soon