Friday, April 13, 2018 2PM ET
From Hall A Wiki
Previous meeting: Friday, March 30, 2018 2PM ET
Media:KK's MOLLER Task List.pdf
Task List Summary
- Simulation tasks Task List by Dustin
- Simulation tasks Task List by Rakitha
- Main detector simulation tasks Task List by Michael
Agenda
- Simulation concerns
- Beamline backgorund
Attendance:
Rakitha, Dustin, Cameron, Sakib, Chandan, Kent
Minutes
Minutes:
- Shower max setup in qsim.
- We may need to implement some parts of shower max detector in the main MOLLER geometry to understand background created by tungsten in the shower max detector (flashback background)
- Geomtery and code updates to read parameter file of the shower max detector into the qsim
- Make a copy to JLab repository
Return to Teleconferences
Return to MOLLER at 11 GeV E09-005