Friday, June 8, 2018 2PM ET
From Hall A Wiki
Previous meeting: Friday, May 25, 2018 2PM ET
Media:KK's MOLLER Task List.pdf
Task List Summary
- Simulation tasks Task List by Dustin
- Simulation tasks Task List by Rakitha
- Main detector simulation tasks Task List by Michael
Agenda
- Simulation coding updates
- Daniel and Audrey are adding generators for specific upcoming SBU simulation tasks
- Designing a function-defined radial position at downstream detector generator
- Also improving the "external" root output file -> input file generator
- Shielding update
- Getting the newest version of remoll (v2.0.0 -> Master) to work with all geometries
- Updating analysis scripts to use the new data structures
- Air/Vacuum Study
- Waiting for the geometry definition in the radiation shielding to be verified by Cameron and Chandan to make a new, more comprehensive set of Air/Vacuum/Helium test geometries
- Spin precession: Ciprian slides
Attendance:
Attendance:
Cameron Clarke, Weibin Zhang, Ciprian Gal, Daniel DeLayo, Chandan Ghosh, Dustin McNulty, Sakib Rahmans, Kent Paschke
Minutes
Return to Teleconferences
Return to MOLLER at 11 GeV E09-005