TDIS Bi-monthly meeting, 2019 March 26

From Hall A Wiki
Revision as of 12:03, 26 March 2019 by Efuchey (Talk | contribs) (Minutes)

Jump to: navigation, search

Back to Tagged DIS run group >> Bi-monthly TDIS meetings

previous meeting << >> following meeting

Agenda

Discussion of response to Beni's comments. Bogdan's estimate of tracking [1]

Minutes

Thia, Bogdan, Nilanga, Kondo, Steve, discussed together with Beni. Out of this discussion, the main real concern that the TAC is worried about is the tracking capability. Remarks to Bogdan input:

  • Track rates are estimated to be 70MHz per section, not 100MHz over all 10 sections. NB: need determine what luminosity is used for Marco's background estimates
  • Questions from Steve:
    • Can a hit be shared by two tracks? Important mostly near the center, where it is more crowded.
    • How to know a track is out of timing and/or determine its vertex? Uncertainty in z_v translate into uncertainty in time.

We have an handle if the track "crashes" onto a wall (because we have one point of reference where we can associate a z to a time) If not, we have no reference. We need to know what fraction of tracks of interest are actually in this situation. => Determine with simulation

Conclusion: Focus on tracking and simulation from now on. Meetings are going to be once every two weeks again.

Organizational details

10:30 AM, JLab meeting room: TED 2547
To join the Meeting:
https://bluejeans.com/550335940
To join via Room System:
Video Conferencing System: bjn.vc -or-199.48.152.152
Meeting ID : 550335940
To join via phone :
  1. Dial:
    +1.408.740.7256 (United States)
    +1.888.240.2560 (US Toll Free)
    +1.408.317.9253 (Alternate number)
    (see all numbers - http://bluejeans.com/numbers)
  2. Enter Conference ID : 550335940