SoLID Weekly : Monday, May.13, 2019 9:30am EDT

From Hall A Wiki
Revision as of 10:14, 13 May 2019 by Tianye (Talk | contribs) (Minutes)

Jump to: navigation, search

Agenda

  • Discussion on SoLID cost estimation according to WBS (Work Breakdown

Structure)

  • Sub-system updates

Minutes

  • JP: Based on the Moller review feedback, we need to prepared more detail cost estimation. JP shows a table for the subsystem cost estimation, and he will send out this form to the person in charge of the subsystems.
  • Paul: Things is changing by the time, so how do we handle the costing changing?
  • JP: small change is normal, if it is a large change we need to discuss with the committee.
  • Nilanga: Is the review is scheduled?

JP: We are looking for August, but it is quite difficult based on the current information. It is probably early September.

  • Nilanga: We should add the overhead, isn't?
  • JP: You just need to add your numbers. And Jlab will use the average cost which includes everything you need.
  • Zhiwen: For the graduate student, should we use 1.5 labor.
  • JP: we will do individual labor estimation.

Present

Alexandre, JP, Haiyan, Paul, Nilanga, Seamus, Guannan, Ye, Junqi, Rich, and Zhiwen