November 6th 2020
From Hall A Wiki
- Updates
- HCAL
- still error
- Bigbite shower : working on detector - might be a good time to try switch to CODA 3
- CDet : looking at resistor for pixel adjustements - one PMT might need to be replaced - still have pedestal shift issue
- Hodoscope :32 out of 92 finished - getting HV setup - use CAEN HV - need interface - switch hodoscope to CODA3 - tedbbdaq
- HCAL
- SBS DAQ bunker
- GEM Bigbite setup
- GEM INFN : running with CODA3 - no APV time puts after HW fixes - increased LV by 0.5 V - reset implemented - will set up
- Ben has new firmware - demonstrate 2.7 KHz rate with VME back plane using the VME320 - VTP developments needs a few weeks - Optical
- GEM UVA : setup crate in
- Andrew UConn PO issued for VETROC