2009 Holiday Schedule

From Hall A Wiki
Revision as of 16:30, 10 December 2008 by Yqiang (Talk | contribs) (New page: == Dec 22, 2008 == # Polarization calibration: EPR, NMR, Temperature # Polarization loss test # HRS Magnet effect test: requires turning ON/OFF magnets for a couple of times # Check laser...)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Dec 22, 2008

  1. Polarization calibration: EPR, NMR, Temperature
  2. Polarization loss test
  3. HRS Magnet effect test: requires turning ON/OFF magnets for a couple of times
  4. Check laser spectrum with cell
  5. Cool down oven