  • Updates
    • HCAL
      • haven't tried new firmware yet
      • data for silo
      • different shapes for a PMT ?
    • Hodoscope
      • one housing not well seated - unstacking and checking
      • 32 bars stacked
      • HV up and running, NINO supply hooked up
      • switch to CODA 3 and have independent session for data taking
    • INFN GEM
      • still check with Paolo for issue
      • backplane for UV chamber ? Paolo should help ? Need to check with Kondo and get start and finalize design
      • INFN UVA : still
      • BB GEM : all scripts installed CODA going - will test with APV
    • CDet
      • roped area around CDet - hot cryomodule in Test Lab - no impact so far on CDet - will
      • finishing up modules - trouble shooting module - PMT might be misaligned - will fix next week - take data for efficiency and crosstalk
      • cables : NINO - max length of 100 feet - 2 sets of cables - one to repeater and one from repeater to TDC - need to locate the cables Doug said he had them ( most likely BB VDC ribbon cables )
      • sbs2 computer reboots by itself - at 5:30 pm Wednesday - need to check if glitch - will look at logs
      • VETROC ordered
      • Kara can work on VETROC setup
      • can setup in clrlpc in new account for new session
    • Shower
      • took data
      • cables for FADC
      • can start with FADC for unconnected channels -
      • get HCAL code to look at FADC data
      • full waveform mode - for testing - production just time and amplitude
  • Cables
    • HCAL cables 100 m ( right now half 50 m )
    • Location of repeaters for the NINO
    • need finalize low voltage for NINO location - not going - need longer LV cables -
    • in TEDF : 100 meters long cables - could use shorter cables