March 26th 2021
From Hall A Wiki
- Updates
- HCAL
- cable GUI installed on enpcamsonne, section 7.5 on wiki for documentation
- looking at cable length attenuation
- HCAL
globally
- gathering spool of cables and lemos to give to Wendy for 60 more cables for overlapping summing
- Chris agreed to make a patch panel for the DAC
- looking for the FADC being repaired
- maybe look into setting up external clock for F1
- Bigbite shower
- Issue with Fastbus getting stuck in weird state. Bryan has a temporary fix.
- 12 FADCs added, jumpers checked to be set to 2V and will start cabling
- Provokar more data for preshower calibration and will switch to FADC
- noise on one side of preshower, HV crate was replaced ( goes away when moving to other HV crate ) but still shifting pedestals on some channels, still need to look at signals with scope ( usually 5 mins runs ), might be ground loop - HV supposed to have same ground but need to check. Some channels have the shift on some channels with scope directly on PMT ( grounding near PMT did not help ), but disappear R26 when HV swapped to another HV card.
Schematics of bases of PMTs ? From Hermes not sure we have. Look with scope on HV too, see in Fastbus even with filter ( so higher frequency noise ).
- Bigbite hodoscope
- fix issues with analysis script - everything working
- more data taking
- Steve working on the TDC scaler using the hodoscope DAQ
- GRINCH
- still working on integration in SBS-offline , some work on best structure
- software running but no data - need to check map
- Juan Carlos has information for podd debugging to display data
- already checked with datadecode that raw data is fine, so still need to fix decoding software
- LHRS
- problem with HV tripping on VDC, added more oil on bubbler fixed it
- Maria working on the DAQ
- eventually will port the FADC setup from Bigbite
- CDet
- issue with sbs2 computer but it was because UPS dead, now plugged directly so working now
- taking data , students looking at data
- Ralph set up CDet channel on slack
- TEDF GEM
- slides from
- clock : daisy chaining from input to output - going through PLL and delay - Ben prefer star configuration to daisy chaining - input 50 ohm terminated low level TTL
- just run on internal clock for the phase study
- UVA GEM
- APV front end and backplane being repaired by electronics group
- tracking APV baseline issue - might be from 5 slot backplane - will try next week
- TS crate cabled, need to switch to CODA3 Centos 7 and continue next week
- Bigbite hodoscope