April 2nd 2021
From Hall A Wiki
Revision as of 11:58, 2 April 2021 by Camsonne (Talk | contribs) (Created page with "*Updates **HCAL ***working on F1 to use 31.25 MHz external clock. Can you trigger from ECL port (fails) or LEMO port (FIFO overflow - resolution lock failure ) - need to check...")
- Updates
- HCAL
- working on F1 to use 31.25 MHz external clock.
- HCAL
Can you trigger from ECL port (fails) or LEMO port (FIFO overflow - resolution lock failure ) - need to check - check config files which had to be modified for low resolution
- tried one FADC but not sure if it is working, will check it, might
- start testing DVCS
- overlapping cables 10 out of 60
- will check trigger output from TI
- BigBite Shower
- started connecting trigger monitor BNC cables - 2 cables need to be fixed, ribbon cables from NIM/ECL to TDC, about 1 day
- started connected cable from patch panel to FADC - 1 day or two to complete
- new mapping files for FADC will be done
- take FADC data next week
- address fixed and firmware updated
- Fastbus disconnected right now
- Bigbite Hodoscope
- could not run the DAQ since Wednesday, 2 weeks ago trigger were moved, using scintillator A instead of B
- coincidence needed without output of TI, need to make sure this is done correctly - L1A from TI has a lot of jitter so Mark did the retiming to improve that
- want scintillator B to still be trigger but has be moved
- checked with Bogdan but not clear - scintillator coverage very small now. Check for preshower maybe ?
- need two people to move scintillator back, or move scintillator A - add another scintillator ? prefers full coverage - self trigger for hodoscope might be possible - Mark will help setting up on Monday
- LHRS
- ET system working : data insertion working and online plots working - small difference with CODA3.1
- Jack will install remaining detectors in LHRS next week
- CDet
- still taking cosmics
- VETROC : all boards available to be picked - crate in weldment to be installed - need to ask to remove one Fastbus
- if student can access JLab can start help setting up locally
- RICH
- can use Fastbus or VETROC : preference in Test Lab
- Bigbite GRINCH
- managed to get VETROC decoder working with CODA3, looks ok with pulser,still need to take real data with better trigger
- VETROC in SBS-offline and working
- need add V792 support
- port event display to SBS offline
- GEM
- GEM TEDF
- Ben has upgraded firmware
- All INFN GEMs debugged on Thursday, everything is reading - still need to check pedestal data and after try new firmware
- will be able to check if can reach 5 KHz ( 2.4 KHz right now )
- isssues with INFN : using fiber 0 which had issue being read out, bug fixed - APV chip issue, can corrupt low level diagnostic for other APVs
- new computer from Bryan - waiting for new disks and will finish set up
- started installing VXS crate for VTP readout - sbsvtp1 and 2 in HCal - some major work to be done for readout with VTP - Ben can give driver details to Bryan later -
- GEM UVA
- received repaired APV and backplane - putting back together - few weeks
- working with Ben trying to find the cause of APV baseline fluctuation
- GEM TEDF
- meeting for computer requirements
- several ideas to upgrade computer system to handle up to 2 GB/s, 1 single machine will not work ( even using ram disk 1.7 GB/s), two data streams - plan to get 4 computer systems
2 concentrators and 2 raid arrays - still in discussion
- Network upgrade will happen in next few days ( Greenlighted by Jessee ) - 4 x 24 10 gigE fibers
- Paul cleared to be on site - Mid April through May
- Online analysis for GMn and GEn RP
- need to check PODD throughput
- online client from ET
- check if analyzer fast enough to handle the data
- analyzer to handle two data streams
- Ole will check throughput of PODD
- hcana on modern machine limited to 5 to 10 MB/s - output data compressed - ROOT compression might slow down - need to select the compression type
- need check data structure - most likely ok since flat arrays
- analysis should clean data significantly - since most is background
- pi0 background up to 90\%
- plan farm online analysis