April 23rd 2021

From Hall A Wiki
Revision as of 10:58, 23 April 2021 by Camsonne (Talk | contribs) (Created page with "*Updates **HCAL **GEM TEDF ***all UVA and INFN MPDs in TEDF have new resistor installed. They are all installed in the crates. INFN is cables and reading out, UVA is in the pr...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search
  • Updates
    • HCAL
    • GEM TEDF
      • all UVA and INFN MPDs in TEDF have new resistor installed. They are all installed in the crates. INFN is cables and reading out, UVA is in the process of cabling new layer installed in place of old one
      • I updated SSP and MPD firmware for the external NIM clock and two word packing, but the test I tried to verify 5kHz is not reaching 5kHz. Ben is looking into it.
      • 3 APVs on an INFN back plane are installed behind the VTP for troubleshooting and readout. Just let us (Ezekiel or myself) know when LV needs to be turned on.