Analysis planning

From Hall A Wiki
Revision as of 14:51, 27 April 2021 by Jwilli (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

VDC Tracking

1. Finalise integration of 3-parameter fit into tracking procedure: need to add timing offset to chi^2 in 'UV matching' stage of clusters.
2. Alter Lookup table method from table to interpolated values: necessary for use of lookup TTD conversion if 3-parameter fit method.
3. Test use of all recorded hits in TDC, not just first hit time. 

Timing

1. Finalise path-length correction for coincidence timing. 
2. Finalise timewalk correction for scintillators. 
3. Either alter scintillator classes to add these processes or set-out post replay method of carrying out corrections. 


Accidental calculation

1. Formalise methods for calculating accidental fraction.

Optics