Shift How-To
From Hall A Wiki
Contents
Overview
Shift Roles
Reporting and Logging
Taking Data
- Using the CODA DAQ
- GUI Description
- Starting a Run
- Stopping a Run
- Monitoring the data
- Online analysis
- Shift checklist
Recovery Procedures
Systems
Beam Line
- Hall A beam line drawing (to be updated)
- Checkout procedure
- spot++ (beam size verification)
- BPM calibration
- HARP scan
- Polarization Measurements
- Compton: Not Used
- Moller
Target
Magnets
- BigBite
- Super BigBite
- LHRS