June 17th 2021

From Hall A Wiki
Revision as of 10:48, 18 June 2021 by Camsonne (Talk | contribs) (Created page with "*Updates **HCAL ***cables in Hall A, split tubing to protect cables (3.5 in tubes ? ) ***check Mahlong Long PR, discuss with Jack *** needed ? **LHRS ***working on FADC readou...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search
  • Updates
    • HCAL
      • cables in Hall A, split tubing to protect cables (3.5 in tubes ? )
      • check Mahlong Long PR, discuss with Jack
      • needed ?
    • LHRS
      • working on FADC readout and analysis
      • got additionnal FADCs, ready to be put in
      • possibility to use HRS FADCs for hodoscope calibration ?
    • INFN GEMs
      • working on shielding : improve noise and common noise
      • uprgrading to SSP readout
    • UVA GEMs
      • received 3 sets of GEM planes
      • finalized design for 47
      • Sean working on UV , issues with back plane being investigated
    • beamline
      • David working with spot++, recompiled but might have database issue
      • gathered scripts from previous experiment
      • Alex will try to fing g2p cabling to be updated for SBS