August 6th 2021
On-going tasks Network setup ( done ) Scaler crate setup (75 % - need put crate in / setup cpu ) 3 rd GEM VXS crate install router moved up ( 75% ) need power and network in GEM bunker detector accounts setup ( check with Ole ) boot VME controllers (GRINCH Hodo Shower , 2GEM crate up ~60 % controller booted - Bryan setting up as in TEDF - need setup MPD new controllers) detector cabling - new MPD production - about to start - need to ship our FPGA to Paolo MPD VTP readout - on-going in daq lab - being setup in Hall A - need setup VTPs to boot setup portservers need to install remote switch for crate in bunker - rest are VXS or VME64 Bigbite - HCal trigger setup TS setup - 0% Beamline crate setup ( in scaler crate ) HCAL cabling HCAL need power Mark hodoscope trigger ? Computer move to Hall A : sbsdaq1/2 tedbbdaq enpcamsonne LHRS fiber pull
Outstanding issues 2 bad FADCs Bigbite - 1 FADC was repaired - one being repaired - 1 Compton FADC SD delay : still need 2 SDs ( Glasgow and INFN just requested quote ) need to adjust for HCAL transit time with different PMTs status of cosmics paddles ( installed by Bogdan ) GEM fibers too short : 60 m ordered 15 bad MPDs