March 11th 2022
From Hall A Wiki
Revision as of 12:04, 11 March 2022 by Camsonne (Talk | contribs) (Created page with "*Updates **HCAL ***two VTP installed in crates, will need to be cabled waiting for power outage, might be outage on Monday **CDet : taking cosmics for left side ***VETROC ***...")
- Updates
- HCAL
- two VTP installed in crates, will need to be cabled waiting for power outage, might be outage on Monday
- CDet : taking cosmics for left side
- VETROC
- ADC for CDet
- SIDIS
- HCAL
- GEn RP
- Hodoscope : mostly focusing on analysis, planning for travel, plan for work on HV, spare crate shipped from Glasgow
- RICH : box open yesterday, still working on detector. No DAQ required for now. VETROC , use VXS crate + VETROC , need to coordinate with hodoscope, GRINCH, CDET for NINO - 2000 channels
- FADC : could use HRS FADC
- 14 FADCs
- SBS GEM : in May June
- HV : need to get new RPi to Bryan