Compton DAQ Dev
Project to Develop a DAQ for the Compton
Here are some notes on the project of developing the Compton counting mode DAQ. The original work was done mainly by Bryan Moffit and Ben Raydo in 2020, with input from others.
It is foreseen to be a precurser of a moller polarimeter DAQ as well as a counting-mode DAQ for the MOLLER project, etc.
See earlier work https://hallaweb.jlab.org/wiki/index.php/Compton_Counting_DAQ_Software_HOWTO
Contents
Budget and Plan
Budget and Plan Upgrade of Compton and moller polarimeter DAQ in halls A and C. The 4 systems are approximately the same. The FADC will be modified to support both counting mode and integrating mode. Item Price each Qty Line cost VXS crate 16.5 k 4 66 k VTP 10 k 4 40 k cpu (ATOM) 3 k 4 12 k SD 2 k 4 8 k scaler 4 k 4 16 k VETROC 2 k 8 16 k TI 2 k 4 8 k I/O 1.5 k 4 6 k Spares 43 k ========================================== TOTAL 215 k$ This plan was approved in Aug 2022. It's essentially 43k$ per DAQ (times 5 since we need spares). We'll buy the first system for the hall C moller in FY2023. This 43k$ is in the FY2023 budget. After that we may need to refine the design. Then in FY2024 we'll purchase/build 3 more DAQs. Finally, buy spares in FY2025.
Current Test Setup
updated R. Michaels Oct 12, 2022
Here is a picture https://hallaweb.jlab.org/wiki/index.php/File:Polarimeter_daq_xfig.pdf
The basic configuration of the DAQ
DAQ config: https://hallaweb.jlab.org/wiki/index.php/File:HaVTP_config.png
ROC1 : https://hallaweb.jlab.org/wiki/index.php/File:Roc1_config.png
VTP : https://hallaweb.jlab.org/wiki/index.php/File:VtpROC_config.png
How to Run the Current Setup
This is a VXS crate located in the TEDF building cubicle 11. The crate is at the top of the rack. The crate was formerly installed in hall A during PREX/CREX.
updated Oct 12, 2022. R. Michaels How to login to the two ROCs and start the ROC ssh -X amoll1 -l sbs-onl ./startroc1 ssh -X havtp1 -l sbs-onl ./startRoc How to start CODA on atedf3. Username adaq. kcoda startcoda VTP readout havtp1:/home/sbs-onl/comptonDaq/vtp/rol/vtp_list.so ROC1 readout amoll1:/home/sbs-onl/comptonDaq/rol/vtpCompton_list.so Oct 12, 2022. Currently using a 50 Hz front-panel pulser trigger on TI. Later want to modify this to use a trigger from VTP based on data from FADC and/or the VETROC. If I drop the VTP from the readout and remove tiRocEnable(2) from amoll1:/home/sbs-onl/comptonDaq/rol/vtpCompton_list.c then the DAQ runs fine and both the FADC and VETROC data make sense. Next I added the VTP. Still a FP trigger. It downloads and prestarts. But here is where the problems start.
Current Problems
Oct 12, 2022. R. Michaels Problematic symptoms: I don't get any events. Actually I get a burst of events on ROC1 but the VTP seems to be stuck. VTP complains a lot: VTP_output.txt Some notable errors vtpInit: VTP_FW_Version=0x10004, VTP_FW_Type=19 vtpInit: ERROR - unknown firmware type 19. Unable to setup VTP PLL. vtpSerdesCheckLinks: ERROR - all serdes links not up! daLogMsg: ERROR: VTP Serdes links not up (I set it up to temporarily ignore that and try to get events) vtpSetCompton_EnableScalerReadout: ERROR: VTP wrong firmware type (15 when the run ends, the VTP segfaults ./startRoc: line 4: 1755 Segmentation fault coda_roc -i -s $SESSION -n vtpROC -t ROC ---------------------------------------------------------------------------------
Detailed printout from VTP https://hallaweb.jlab.org/wiki/index.php/File:VTP_output.txt
Analysis Software
Nothing here yet. Work in progress. But there was software for the DAQ used during PREX/CREX.
Old Results
- <a href="https://userweb.jlab.org/~rom/Compton_Info>Background info</a> results using ML.
- <a href="https://userweb.jlab.org/~rom/Compton_ML">tracking and asymmetries</a> results using ML.
- <a href="https://userweb.jlab.org/~rom/compton_old">embarrassingly old material</a>