Pol He-3 Target Information GEn
From Hall A Wiki
Contents
- 1 Experiment Information
- 2 Target Operator Instructions
- 3 Checklists
- 4 Expert Instructions
- 5 Reference Cell Information
- 6 Production Target Cell Information
- 7 Additional Documentation
- 8 Manuals
Experiment Information
Target Operator Instructions
- PolHe3 Target Training Slides [1]
- PNMR Training slides
- How to bring up relevant target GUIs
- Polarized He3 Target Operational Restrictions (raster, beam current limits, etc)
- Procedure for Moving Between Target Cells
- Reference Cell Fill Procedure
Checklists
- Checklist before starting Target Work inside the Enclosure REVIEW THIS PAGE
- Backout Checklist after Hall Access for Target Work REVIEW THIS PAGE
- Backout Checklist after Target Work inside Enclosure REVIEW THIS PAGE
Expert Instructions
Target Cell
Reference Cell
Cooling Jet Alignment
Pol He3 Field Mapping Data
Pol He3 Field Map from TOSCA simulation
Circular Raster Information
Reboot Switches
Reset Target Ladder Motion Control
Cable/RTD/Signal Maps
Fiber RTD hardware trip points
PolHe3 Alarm Handler defaults
Reference Cell Information
- Documents from Todd?
Production Target Cell Information
PolHe3 Polarization Citation/Reference Link
Final Cell polarizations and supporting documentation is (will be) on the Hall C DocDB https://hallcweb.jlab.org/doc-private/ShowDocument?docid=1182 Use that URL as a citation/reference in papers.
Additional Details
Nominal Cell Status summary slide
- Any cells that are production ready need to be flagged as such
- Any cells that have seen beam should be flagged with the date range
- Production cell target chamber wall thickness measurement location (JLab Measurements)
File:Production Cell Wall Thickness.png
- Production cell target chamber wall thickness measurement location (UVa Measurements)
Currently Installed Cell
- Briana
- Re-Installed in target: 08/21/2020
- Originally Installed in target: Cell for Initial testing 12/15/2019 to 01/04/2020
- Characterization Document: Media:Production_Cell_Info_-_Cell_Briana.pdf
Cells Being Readied for Installation
- Tommy -- next cell; being remounted
- Installed in target: (Soon ready for install; Planned for next Production Cell)
- Characterization Document: Media:Production_Cell_Info_-_Cell_Tommy.pdf
- Butterball
- Installed in target: (Future Production Cell)
- Characterization Document: Media:Production_Cell_Info_-_Cell_Butterball.pdf
Older Installed Cells
- Austin
- Installed in target: 03/20/2020 to 8/21/2020
- Characterization Document: Media:Production_Cell_Info_-_Cell_Austin.pdf
- Big Brother
- Installed in target: 02/12/2020 to 03/13/2020
- Characterization Document: Media:Production_Cell_Info_-_Cell_Bigbrother.pdf
- Dutch
- Installed in target: 01/04/2020 to 02/10/2020
- Characterization Document: Media:Production_Cell_Info_-_Cell_Dutch.pdf
- Fulla
- Installed in target: November 2019 (Backup Cell)
- Characterization Document: Media:Production_Cell_Info_-_Cell_Fulla.pdf
Addition Documentation
- Spreadsheet from Chris Jantzi (July 8, 2020) : Media:A1n Cell Characteristics - 08Jul2020.xlsx
- Media:Target_Summary_-_Wall_Thickness.xlsx
- Mingyu Chen (March 22, 2021): Media:Production_Cell_Info_-_Pumping_Chamber_Wall_Thickness.pdf
- "Frequency shifts in the EPR spectrom of 39K due to spin-exchange collisions with polarized 3He and precise 3He polarimetry" (Kappa_0) Paper: arXiv link, Local copy (16Oct2021)
Additional Documentation
Target CAD Files/Photos
- Document Control Group
- Use 'Advanced Search Options': Category='hall c', Document number='67507'
- Selected Target Shop Drawings
- Target Ladder
- Carbon Foil Mount Plate
- 7 foils spaced 2.625" (6.667 cm) apart
- Upstream entrance window should be at z=-30.0cm (based off 67507-00017-1.pdf, 67507-00014.pdf, 67507-00024-1.pdf)
- Target Oven
- Platform and coils
- Carbon Foils
- Photos of Target Setup (google drive link)
- CAD Models from Bert