Morning |
Session
|
8:00 |
Closed Session |
(15) |
|
8:15 |
Remarks from Chair and Charge |
Chair (5)
|
8:20 |
Charge item 1: Experiment plan as approved by PAC47 |
BogdanW (10+5)
|
8:35 |
Charge Item 1: Design report including modifications to beamline, SBS and detectors () |
Robin Wines (15+15)
|
9:05 |
Charge Items 1c, 2b, and 6: The simulation and data analysis software status for the experiment ([pdf]) |
Andrew Puckett (20+20)
|
9:45 |
Break |
(15)
|
10:00 |
Charge Items 1b, 2a: GEMs and associated electronics; GEM reconstruction efficiency at high rate ([pdf]). |
Holly Szumila-Vance (20+20)
|
10:40 |
Charge Item 1d: ECAL calorimeter (ppt) |
Donald Jones (20+20)
|
11:20 |
Charge Item 1f and 5: GEp experiment DAQ and Slow Controls ([pdf]) |
Alex Camsonne(10+10)
|
11:40 |
Charge Item 1f: Trigger based on fADC ([pdf]) |
Ben Raydo (10+10)
|
12:00 |
Lunch |
(60)
|
Afternoon |
Session
|
13:00 |
Charge Item 1e: Coordinate Detector ([pdf]) |
Peter Monahan (15+10)
|
13:25 |
Charge Item 1a: Target and scattering chamber configuration ([pdf]) |
S. Covrig Dusa (10+10)
|
13:45 |
Charge Item 4: Installation (pdf) |
Jessie Butler (15+15)
|
14:15 |
Charge Item 3: The responsibilities, manpower and other resources ([pdf]) |
Mark Jones (10+10)
|
14:35 |
Break |
(15)
|
14:50 |
Charge Item 8: The beam commissioning procedures and polarimetry ([pdf]) |
William Henry (10+10)
|
15:10 |
Charge Item 7, 9: RSAD, Safety Documents for GEp ([pdf]) |
Evaristo Cisbani (10+10)
|
15:30 |
Closed Session |
(2 hours)
|
17:30 |
Closeout |
|
|
Draft of COO (pdf) |
|
|
Draft of ERG (pdf) and chart (pdf) |
|
|
Draft of ESAD (pdf) |
|
|
RSAD from Radcon (pdf) |
|
|
OSP for Hadron Calorimeter, HCal-J (pdf) |
|
|
OSP for Coordinate Detector, CDet (pdf) |
|
|
OSP for GEM detectors (pdf) |
|
8:00 |
Closed Session |
(15) |
|
8:15 |
Remarks from Chair and Charge |
Chair (5)
|
8:20 |
Charge item 1: The GEp experiment plan as approved by PAC47 |
BogdanW
|
8:35 |
Charge Items 1c, 2b, and 6: The simulation and data analysis software status for the experiment |
Andrew Puckett
|
9:15 |
Charge Items 1b, 2a: GEMs and associated electronics; GEM reconstruction efficiency at high rate |
Holly Szumila-Vance
|
9:55 |
Charge Item 3: The responsibilities for each job identified, the manpower and other resources necessary to complete them on time |
Mark Jones
|
10:25 |
Charge Item 4: The entire beamline, spectrometers, detector configuration been defined, including ownership, maintenance and control during beam operations |
Jessie Butler
|
10:55 |
Charge Item 1: Design report including modifications to beamline, SBS and detectors |
Robin Wines
|
11:25 |
Charge Item 1a: Target and scattering chamber configuration |
S. Covrig Dusa
|
12:45 |
Charge Item 1d: ECAL calorimeter |
Donald Jones
|
13:25 |
Charge Item 1e: Coordinate Detector |
Peter Monahan
|
13:50 |
Charge Item 1f and 5: GEp experiment full DAQ |
Alex Camsonne
|
14:20 |
Charge Item 1f: Coincidence trigger based on fADC |
Ben Raydo
|
14:55 |
Charge Item 8: The beam commissioning procedures and polarimetry |
William Henry
|
15:15 |
Charge Item 7, 9: RSAD, Safety Documents for GEp |
Evaristo Cisbani
|