ERR
From Hall A Wiki
Experimental Readiness Review 2023
- Date: April 24 2023 (Monday)
- Location: L102
- Zoom : Zoom link
- ERR Committee
- Nathan Baltzell (Computing Resources)
- Pavel Degtiarenko (Radiation)
- Sergey Furletov (GEM)
- William Gu (Electronics/DAQ/Slow Controls)
- Dave Meekins (Target)
- Bill Rainey (EHS)
- Yves Roblin (Beam Operation)
- Alexander Somov (Trigger)
- Stepan Stepanyan (Calorimeter+Coordinate Detector) Chair
- Simon Taylor (Simulations and data analysis)
- Beni Zihlmann (Polarimeter)
- Douglas Higinbotham (Observer)
- Ed Folts (Observer)
- Keith Welch (Observer)
- ERR Charge ([1])
- GEp Proposal ([2])
- GEp Proposal Update ([3])
- Report on a prototype 16 block version of the ECAL in beam conditions
Agenda
Morning | Session | ||
8:00 | Closed Session | (15) | |
8:15 | Remarks from Chair and Charge | Chair (5) | |
8:20 | Charge item 1: Experiment plan as approved by PAC47 ([4]) | BogdanW (10+5) | |
8:35 | Charge Item 1, 4: Design report including modifications to beamline, SBS and detectors([5]) | Robin Wines (15+15) | |
9:05 | Charge Items 1b: GEMs and associated electronics; ([6]). | Holly Szumila-Vance (15+15) | |
9:35 | Charge Items 1c, 2a, 2b, and 6: The simulation and data analysis software status for the experiment, GEM reconstruction efficiency at high rate (PDF) | Andrew Puckett (25+25) | |
10:25 | Break | (15) | |
10:40 | Charge Item 1d: ECAL calorimeter (pptxpdf) (Follow up ECal heating test slides) | Donald Jones (20+20) | |
11:20 | Charge Item 1f and 5: GEp experiment DAQ and Slow Controls (pdf) | Alex Camsonne(10+10) | |
11:40 | Charge Item 1f: Trigger based on fADC ([7]) | Ben Raydo (10+10) | |
12:00 | Lunch | (60) | |
Afternoon | Session | ||
13:00 | Charge Item 7, 9: RSAD, Safety Documents for GEp ([8]) | Evaristo Cisbani (10+10) | |
13:20 | Charge Item 1e: Coordinate Detector ([[9] pdf]) | Peter Monaghan (15+10) | |
13:45 | Charge Item 1a: Target and scattering chamber configuration ([10]) | S. Covrig Dusa (10+10) | |
14:05 | Charge Item 4: Installation ([11]) | Jessie Butler (15+15) | |
14:35 | Break | (15) | |
14:50 | Charge Item 8: The beam commissioning procedures and polarimetry (pdf) | William Henry (10+10) | |
15:10 | Charge Item 3: The responsibilities, manpower and other resources (pdf) | Mark Jones (10+10) | |
15:30 | Closed Session | (2 hours) | |
17:30 | Closeout | ||
Draft of COO ([12]) | |||
Draft of ERG ([13]) and chart ([14]) | |||
Draft of ESAD ([15]) | |||
RSAD Table from Radcon ([16]) | |||
OSP for Hadron Calorimeter, HCal-J ([17]) | |||
Draft of OSP for Coordinate Detector, CDet (pdf) | |||
OSP for GEM detectors (pdf) | |||
OSP for SBS and corrector magnets power supplies ([18]) | |||
OSP for SBS motioning and positioning system ([19]) | |||
DetailedSchedule_April2023 ([20]) |