Priority Items

SE-II search

HMS drift chamber low voltage supply replacements

Moller maintenance OSP

SBS corrector OSP?

Sieve slit controllers OSP

VVUs on HMS

Guards on HMS dipole leads

Oscillator for LN2 level meter

BigBite Argon manifold pressure sensor erratic. Need to clean the connections?

Some of the SBS magnet bus bars have been running hot. Do we need to re-torque them?

Readout for LCW pressure sensors added at end of beamline walkway (not started)

Add "T's" and pump out ports to HMS magnet vacuum gauge ports.-Steve didn't want work done.

Cryo

Pump-out (CVI) replacement (Lars)

Remove actuators from right arm magnets (Hall A). (Dipole/Q3 complete)

Build local valve control boxes with local read out.

op check/repair hall C vacuum gauges (in progress - Lars)


Specifications for power supplies for HKS (coordinate with Sarin)

Hall probes/NMR (?) for HKS

Troubleshoot HMS Q1 LN2 temp sensors.

Check HMS magnet leads for leaks/repair.

Troubleshoot HMS Dipole siphon temp.

Extend HMS Q1 warm return control wires and re terminate/calibrate.

Check all JT actuators, ensure belt is functional and in the correct orientation.

Insulate HMS N2 shield return line.

Insulate SHMS Warm return line across pivot.

Troubleshoot HMS Quad Vac gauges.

Warm up SHMS Dipole

De-sting SHMS 4k He supply line.

Repair SHMS 4k supply ball valve assembly.

Cool SHMS DI, Q3, Q2, Q1.

After HB magnet electronics controls installation complete, cool HB Magnet.

Warm HMS Dipole.

Repair lead leak on HMS Dipole.

Cool HMS Dipole.

Electrical

Capacitor discharge stick

Isolating power switches on HMS power supplies

Specifications for power supplies for HKS (coordinate with Sarin)

Spectrometers

Make HMS dipole NMR lock better

Hall probes/NMR (?) for HKS

Gas systems

Do We Still Need To Do These?

Possible Future Items