Remaining GEn-RP install tasks

From Hall A Wiki
Revision as of 12:12, 22 March 2024 by Hszumila (Talk | contribs)

Jump to: navigation, search
  • SBS side LV:
    • Joe to connect, instruct on controls
    • Ellen to install some controller and readback
    • Input the jumpers on the breakout panel (DONE!)
    • Run the cables (after all HDMI connected)
  • SBS GEMs:
    • Install XW into stack (week of 25-Mar)
    • Finish signal cabling (asap)
    • Connect to HV patches (after HDMI cabling complete)
    • Install scintillators until run start on inline stack
    • reconnect gas to RP layers (after BB XY work?)
    • techs to install final shielding blocks around the electronics hut (after we are happy with the reboot connections in the bunker)
  • BB GEMs:
    • Upgrade the XY HV, re-install (would like to have SBS troubleshooting going on at the same time so as not to hold this up)
  • Readout:
    • Balance VTP fibers amongst crates to optimize (after GEMs are installed)
    • Ensure that reboot/troubleshooting script works for all crates (after electronics is working)
  • High voltage:
    • Finish channels in GUI (in progress)
    • replace small screws on radial connectors? (optional)
    • move HV to working reboot strip (when we have one)
    • finalize script for GUI upload of HV and operation (in progress before 1-Apr)
  • Update the documentation on the HV and LV operations (before beam)
  • GEM experts on call (setup before beam)