Remaining GEn-RP install tasks

From Hall A Wiki
Revision as of 20:54, 2 April 2024 by Hszumila (Talk | contribs)

Jump to: navigation, search
  • SBS side LV:
    • Ellen to network for browser access (in progress)
  • SBS GEMs:
    • techs to install final shielding block around the electronics hut
    • Finish cabling, low level testing, cosmics (in progress)
  • BB GEMs:
    • Finish cabling, low level testing, cosmics (in progress)
  • Update the documentation on the HV and LV operations (before beam)
  • GEM experts on call (in progress)
  • Clean up our areas: move our stuff out of the Hall (in progress)
  • Update channels in the alarm handler
  • High voltage cables?!