ECal Apr4 2024

From Hall A Wiki
Revision as of 17:59, 3 April 2024 by Jonesdc (Talk | contribs) (Created page with "<<Back =ECal Weekly Meeting Apr. 4, 2024= *Detector update: Don *Cable etc. update: Albert *Prototype heating test: Don *PMT preparation and testing:...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

<<Back

ECal Weekly Meeting Apr. 4, 2024

  • Detector update: Don
  • Cable etc. update: Albert
  • Prototype heating test: Don
  • PMT preparation and testing: Simona, Deb, Jimmy
  • Cooling system: Jimmy
  • Heater controls: Marc McMullen