GMn GEM commissioning Meetings: WEDNESDAY 10:30am - 11:30am

Link to all previous meetings: GMn GEM Commissioning Meeting

Please use sbs_gems mailing list for plots/communications and HALOG entries relevant to GEMs!


Commissioning in GEn-RP

  • Thursday night, as we moved to H at 25uA, several shorts occurred in SBS [1]
  • To our knowledge, the gas mix and the HV set points to the SBS GEMs are the same as always during running. They have new individual channel power supplies. [2]
  • The gain in the SBS GEMs appeared to be very high (so either mix is not what we think or HV too high or both).
  • Single sector shorted in BB when the gas mixture spiked to 90% on Friday due to empty CO2 and lack of alarms. Alarms and shutoff script are in place and verified now.
  • Gas flow to SBS is now set to 70/30 (what we think is 70/30), and HV is reduced and tweaked across G1 to improve the gain. [3][4]
  • Offline software thresholds reduced to 3sigma also shows improvement in efficiencies.
  • Work done yesterday to decouple (HV) two of the SBS chambers that were previously unable to run. [5]
  • Plan in the near future: install a small wire chamber on the SBS gas line to monitor gas, install a photon filter ~ 0.5" Aluminum plate on the SBS side to reduce occupancies.

Known issues

  • L3M3L2M1 (G2 &G3) — L3 faces the analyzer, L2 is high..decoupled now and only running L2M1 (L3M3 off)
  • L4M0M1 (G2) — faces the analyzer, high ...decoupled now and only running L4M1 (L4M0 off)
  • L5M2M3 (G2) - this one is low and possibly accessible, but needs to be slid out
  • L6M0M1 (G3) (beamline side) – it’s high and likely hard to reach
  • L6M2M3 (G3) — this one is low and possibly accessible, but probably too tight a fit to check anything
  • L8M0M1 (G2 & G3) – might be easily checkable from the platform with a stepladder or the one with handrails. This is on the HCAL side. (currently kept off)
  • L6M0 gas issue?

Misc for GEn-RP

  • Experts on call: [6]