ECal Jun6 2024

From Hall A Wiki
Revision as of 08:48, 6 June 2024 by Jonesdc (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

<<Back

ECal Weekly Meeting June 6, 2024

  • Timing of startup
  • Detector update: (heater power supply, cables, DAQ layout, cable map, placement of extra cables) Don
  • Cable etc. update: Albert

64 Bigbyte and GRINCH cables (8 bundles) removed and can be moved to ESB for re-processing and bundling/labeling.

  • Cookie test: Bogdan

Bogdan used a radioactive source (Na22) placed on a supermodule in EEL 122 and measured the anode current with and without the cookie. He reported that the current increased by 1.4 with the cookie compared to just air contact. Cookies placement and pressure are not likely to be a major source of difference in light transport.

  • Prototype heating test: Don
  • PMT preparation and testing: Simona, Jimmy
  • Cosmics test: Simona [1][2][3]
  • Cooling system: Jimmy
  • Heater controls: Marc McMullen

https://jlab-org.zoomgov.com/j/1613109323