Noteable events list for d2n

From Hall A Wiki
Revision as of 17:42, 28 May 2009 by Posik (Talk | contribs)

Jump to: navigation, search

Experiment Changes

Beam Pass Changes

Major Changes

  • 02/05/09
    • 18:05: 3He cell SAMANTHA and reference cell GMA installed
  • 02/07/09
    • 18:43-21:52: BB CAMAC crate down
    • 22:29: BB TDC delay cables fixed(~360ns)
    • 22:29: BB Cer output widths on discriminator set to 100ns
  • 02/08/09
    • 15:39: Oven temp controller replaced
    • 16:00: DAQ set to 1DAQ
    • 17:50: Ethane/Argon mix on pressure regulator at 1psi
  • 02/09/09
    • 17:03: BB MWDC gas system pressures returned (Ethane/Argon)
  • 02/10/09
    • 06:51: LHRS polarity set to +
    • 09:44: BB sieve in
    • 10:29: BB Wire Chamber thresholds changed C1=3.9V,C2=4.8V,C3=4.8V
    • 11:17: T6:threshold_BB -s BB_Sh -120mV->450MeV
    • 11:17: T1:threshold_BB -s BB_Sh_2 -80V->300MeV
    • 11:31: PMTs put in flash ADCs
    • 14:10: seive out
    • 14:16: PMTs back in V792 ADC
    • 16:35: RHRS DAQ restored for pvdis parasites
    • 17:55: BB T1,T6 thresholds set to -10mV
    • 18:15: BB polarity set to positive
    • 19:08: BB sieve in
    • 20:18: Threshold for BB_Sh=-0.120V BB_Sh_2=-0.080V BB_cer=-0.070V
    • 20:58: BB Cer T2 timing,outputs of AND units normalized to 150ns
    • 20:58: BB Cer T2 timing, output of P706 shortened to 50ns
    • 21:33: Compton HV = -1800V
  • 02/11/09
    • 03:25: Sieve out
    • 08:20: BB and LHRS polarity changed to negative
    • 09:56: DAQ put in 2DAQ mode
    • 09:58: T3 T4 trigger cables unplugged from BB
    • 11:17: 0.3x attenuuator added to photon signal going into DAQ
    • 15:18: BB MWDC threshold change
      • front = 3.898
      • mid = 4.800
      • back = 4.800
    • 22:56: Sync problems in ROC4, slot 18 (1875 TDC) missing gates in buffer mode
  • 02/12/09