HAPPEx III Work List
What |
Postdoc |
Description
|
DAQ
|
Dustin
|
AutoDB and blinding
|
Analysis chain
|
Mark
|
Run analysis on HAPPEx II data
|
Detector prep
|
Dustin
|
|
Moller polarimeter
|
Dustin
|
Dustin, Luis and Sasha become experts at running the Moller polarimeter
|
Compton polarimeter
|
Mark
|
- Electron detector (Alex, Bob)
- Increase IR cavity power (Mark)
- Understand transfer function
- Find script that runs 1/4 wave plate scan
|
Accelerator dev/liason
|
Mark and Dustin
|
- Run 8 cables to source table (Riad)
- Modulation
|
Installation planning
|
|
- When is the detector going in?
- What tools are needed?
- Give Ed a list of surveys that are required
|
Commissioning planning
|
|
|
Documentation and administration
|
|
- COO, ESAD, TSOP must be produced. Shift workers must be asked to read and sign before shift.
- Target training must be organised and advertised.
- Shift schedule and signup sheet (done)
- Run coordinator signup (Xiaochao)
- Online documentation for shift workers
|
LINKS
Michaels work list for HAPPEx III, PVDIS and PREX