Run Plan

From Hall A Wiki
Revision as of 05:19, 1 April 2010 by Igorko (Talk | contribs)

Jump to: navigation, search


  • Tune beam to 1 pass, Set HRS(L) and HRS(R).
  • Move the HRSs to 15 (-15) Deg. HRSs calibration C(e,e') (elastic) with/ without sleeves.
  • Move HRS(R) to 12.5 deg, Set BigBite at 68 Deg.
  • Momentum scane for BigBite calibration, H(e,e'p) Kin A 1,2,3.
  • Energy change 1 pass to 2 pass.
  • Continue calibration of BigBite H(e,e'p), D(e,e'p) and C(e,e'p) Kin A 4,5, B 1,2 and C1
  • Put the Neutron array (without the lead wall) at 50 Deg and 15 meters from target. Calibration of the HAND with


BigBite angle change. (Rotate BB to an angle so that there will be no obsticle in the line of sight from target to the n-array).


  • n-array commision, Kin B1


  • Change set-up to BB and N-Array both at 99 Deg + Energy change 2 pass to 4 pass


  • Singles rates study


  • D(e,e'pn) X<1, Kin D1

End of commision

  • D(e,e'pn) X>1, Kin E1


  • SRC Run, low Momentum range, Kin F1


  • SRC Run, High Momentum range, Kin F2