Task assignement August 15th 2010

From Hall A Wiki
Revision as of 18:19, 8 August 2010 by Camsonne (Talk | contribs)

Jump to: navigation, search

Back to DVCS

Experiment tasks


Name Expertise Secondary expert Task list Completion level / Completed / Left to be done Estimated completion date Main task
Alexandre Camsonne ARS DAQ, Slow control, decoding, paperwork Trigger
  • ARS test readout
  • ARS final readout
  • Buffering test
  • DVCS HRS Trigger implementation
  • Test decoder
  • Slow control LED
  • Slow control current ADC
  • HRS integration
  • COO
  • ESAD
  • RSAD
  • TOSP
  • 40 % ( need implement checks and not working 100 % )
  • 20 % ( need read all boards )
  • 30 % ( need connect busy and create buffered read out )
  • 0% ( when trigger logic is available )
  • 60 % ( need implement checks )
  • 50 % ( hardware ok - need write C functions driver and ROOT interface )
  • 70 % ( ADC and patch ready - need to cable and test )
  • 0% ( waiting for crates to be in HRS )
  • 90 % ( need edit files )
  • 30 % ( need adapt to DVCS )
  • 20 % ( Pavel just go started on it )
  • 0 % ( still not found old one )
Buffering test
Eric Fuchey Calibration pi0, Photon Compton, RG213 RG213
Florian Itard Shift schedule, RG213
Magalie Magne Electronics ARS + Calorimeter triggger
Hisham Albataineh RG213 RG213 RG213
Carlos Munoz Software, Survey, (Elastic calibration ?),MySQL
  • Waveform analysis
  • Survey
Julie Roche Software, curing, cosmics paddle DVCS analysis on adaq DVCS analysis on adaq
Charles Hyde Run plan Run plan Run plan
Robert Michaels Helicity, HRS trigger, CompSimple
  • Helicity
  • HRS trigger
  • CompSimple
  • 80 % - checks left ?
  • 50 % - reuse APEX - need Charles timing and logic diagrams - Magalie logic module to complete
Sophia Iqbal ( until august 31st ) Online GUI, EPICS start/end run

}